CLEAN ROOMS University laboratory type L2 New building for a public university center specializing in physics and industrial chemistryLocation: Central Paris (75)Installation of cleanroom envelopes (ceilings, partitions, doors) in over 90 L2 laboratories and one animal house.Inflatable grommet managementInterlock management for SAS logic and safety servo control
AGRI-FOOD Food processing plant Construction of a food processing plantLocation: Haut-Rhin (68)12,000 m² of panels installed+ More than 120 doors and 50 glazed frames installed
LARGE KITCHENS APSH central kitchen Construction of a central kitchen for a hospital centerLocation: Hérault (34)Cooking area made entirely of fireproof panels1,250 m² of panels installed27 doors and 10 glazed frames installed
MAINTENANCE AND SERVICE Maintenance and modification of cleanroom doors Maintenance and modification of cleanroom doorsLocation: Ain (01), Isère (38), Rhône (69)Reinforcing sliding door fastenersAdjusting door closers after room pressurizationReplacement of a pedestrian door with a recovery roll-up door: adaptation of partitions, door reconditioning and commissioning
AGRI-FOOD Fitting out a logistics building Construction of a logistics building with temperature-controlled receiving dock.Location: Val d'Oise (95) Use of QUADCORE panels (reaction to fire) and cleanroom panels inhoneycomb.Independent structure required with MULTIBEAM system to supportcleanrooms.
AGRI-FOOD Cutting workshop Construction of a cutting plantLocation: Nièvre (58)Installation of 1,310 m² of PIR insulated panels + 6.50 m² of floor panelsInstallation of 3 ½-hour fire-rated revolving doors, 1 negative isothermal revolving door, 24 positive doors, 12 semi-isothermal doors, 5 polyethylene to-and-fro doors, 1 fire-rated positive isothermal revolving door, 1 pressure relief valve, door protectors, skirting boards
LARGE KITCHENS Municipality's central kitchen Construction of a 1,800m² central kitchen for over 4,000 meals/dayLocation: Rhône (69)Site duration: more than 6 monthsExpertise in temperate environments, thermal bridge treatment and inter-lot coordination 6 panel references and 8 door references used to meet alltechnical and aesthetic requirements.
LARGE KITCHENS College kitchen Building a kitchen for a middle schoolLocation: Ain (01)New wood-frame construction400 m² of panels installed16 doors installed
LARGE KITCHENS EHPAD central kitchen Complete renovation of a nursing home kitchenLocation: Vaucluse (84)1,000 m² of panels installed25 doors installed
AGRI-FOOD Food plant compartmentalization Food plant compartmentalizationLocation: Saône et Loire (71)Objective: Optimize space to integrate new production lines.Metal framing adapted to site constraints.Use of rock wool panels (150 mm) complying with DTU and M0 standards.Work in food production areas without interruption of activity.
AGRI-FOOD Construction of a canning factory Construction of a canning factoryLocation: Haute-Vienne (87)Installation of 450 m² of PIR insulated panelsInstallation of 1 positive isothermal sliding door, 1 negative isothermal sliding door, 2 sectional doors + PVC skirting boards
CLEAN ROOMS ATHM clean room Creating a clean room for an ATHMLocation: Haute-Savoie (74)Partitions: 400 m² of rock wool panels installedCeilings: 200 m² of Nida panels installedSpecial feature: installation of double hangers to take up the FFU ceiling below the Nida ceiling.
CLEAN ROOMS Aerospace Research Center Construction of clean rooms and gray rooms for a technical center for aerospace researchLocation: Essonne (91)Installation of watertight partitions and ceilings on raised access floors, with insulation of penetrations underneath.Premises meeting microelectronics requirements (grey fingers, inactinic film on lighting and glazing, etc.).
CLEAN ROOMS Containment systems plant Production plant for drug containment systems Location: Aisne (02)Type of work: ................................................Special features: .....................................................
LARGE KITCHENS Central Restaurant - Research Center Construction of a central restaurant for a research centerLocation: Haute-Garonne (31)Supply and installation of 2,200 m² of insulated panelsInstallation of 34 aluminum framesInstallation of 16 insulated doors and 44 semi-insulated doors
AGRI-FOOD Food superstore Construction of a food superstoreLocation: Gars (30)Installation of a 48 m long by 9.15 m firewall between the warehouse and the 2h storage area Partition/partition connection: rockwool caulking and omega profile finish in lacquered sheet metal.Partition/roof connection: rockwool caulking and lacquered sheet-metal closures.
LARGE KITCHENS School group kitchen Creation of a large kitchen for a school groupLocation: Puy de Dôme (63)Installation of 750 m² of PIR insulated panels, 6.50 m² of negative ground panels, Installation of 1 negative isothermal revolving door, 3 positive doors, 12 semi-isothermal doors, 2 polyethylene to-and-fro doors, 7 fixed PVC frames, 1 pressure relief valve, 230 ml of protective rails, protective corners, PVC skirting boards.
MAINTENANCE AND SERVICE Creation of an outdoor containment area Creation of a sheltered outdoor containment areaLocation: Ain (01)Objective: Improve the operating conditions of machines exposed to aggressive environments.Tailor-made creations in a small spaceMaterials used: FM Global-approved QUADCORE lampré stainless steel panels
MAINTENANCE AND SERVICE Rehabilitation of a run-down manufacturing area Rehabilitation of a deteriorated production area in a cheese factoryLocation: Ain (01)Renovation of partitions and ceilings in stainless steel veneerCorrosion spot treatmentReplacement of tiled skirting boards with stainless steel skirting boards
MAINTENANCE AND SERVICE Dismantling a cold store Dismantling a logistics fridge in a pharmaceutical facilityLocation: Isère (38)Dismantling of partitions, ceilings and structural steelwork using handling equipment and suction padsIdentification and packaging of the set for re-use.